TTDCRUTT 786

Marpower Takes Gas Turbine Propulsion to Sea on Cruise Ships

Marpower's gas turbine system will undergo testing aboard cruise ships, a trial that could eventually pressure the piston-engine default in newbuild orders.

Marpower gas turbine system to be tested on cruise ships - Seatrade Cruise News
Marpower gas turbine system to be tested on cruise ships - Seatrade Cruise Newssusannp4 / pixabay

Itinerary

  1. Marpower's gas turbine system will be tested on cruise ships, per Seatrade Cruise News.
  2. No cruise operator partner, vessel or trial start date has been disclosed yet.
  3. Gas turbines compete with the LNG dual-fuel piston engines that dominate current cruise newbuild orders.

Marpower's gas turbine system is headed for testing on cruise ships, moving the technology from the engine hall to the deck of the industry's most fuel-sensitive segment.

Seatrade Cruise News reports that the turbine developer will trial its system in a cruise setting, a market where propulsion choices carry outsized weight for operators' balance sheets. The details on operators, vessels and timelines remain thin in the initial report, which is worth noting before anyone recalibrates an order book.

What is actually being tested?

Gas turbines (engines that convert natural gas or other fuels into rotational power, rather than using piston combustion) have served naval and megayacht applications for decades. Cruise is a different test. Ships run hotel loads around the clock, in port and at sea, so any turbine candidate must prove endurance as much as peak output.

For sellers of cruise inventory, the relevance is indirect but real. Propulsion and power generation account for the largest share of a cruise ship's fuel spend, and fuel is the second-biggest operating cost after labor. Any hardware that trims that line eventually shows up in itinerary pricing and margin.

Why cruise lines are watching

The sector's decarbonization pressure keeps building, from the EU's emissions rules to port-side shore-power mandates. LNG dual-fuel engines are the current default in newbuild orders at yards like Meyer Werft, Chantiers de l'Atlantique and Fincantieri. Turbines are not yet part of that mainstream conversation, which is precisely why a working trial matters more than a press release.

A test program, if it succeeds, would give naval architects an alternative to the piston-engine configurations that dominate current newbuild specifications. If it stalls, cruise keeps its existing supply chain. Either outcome is informative.

The caveats

nSeatrade's report does not yet name the cruise operator partnering on the trials, the ship class involved, or a start date. Until those specifics land, this is a development to log rather than a shift to trade on. Trials on working passenger vessels are rare and expensive; lines that volunteer tonnage usually want the engineering credit publicized.

The next concrete disclosure — a partner line, a hull, a date — will tell us whether Marpower has a real foothold or a promising bench project. Watch for it.

via Google News: Cruise industry (Source)

Share this article:

More from Daniel Okafor

Daniel Okafor

Show full bio

Market editor covering technology and product news in Tourism industry coverage for trade professionals at Travel Trade Desk.

453 articles

Also boarding · Related articles

« Previous flight